- 470 2G Sites Extension
- 100 3G Sites
- Nominal Plan
- Site Survey
- Transmission Planning
- Initial Tuning
- Optimization of current sites
- 30 Engineers

- 3G Network Initial Tuning & 2G Expansion
- Turkey East Region
- Single Site Verification Tests, 3G
- Single Site Verification and Function Tests, 2G
- Cluster Acceptance and Optimization, 3G
- 2G Swap and Cluster Acceptance (Erzurum)
- UMTS Performance
- HSPA Performance
- 5 DT Teams
- 3 Analysis Engineers

- 2G Network Benchmark Project
- 2G Hotspot Analysis
- 3G Network Cluster Verification Project
- Samsun Region 14 cities BM
- 7 cities Hotspot
- Major Roads and Railways
- Comparing the 3 operators
- GSM
- GPRS-EDGE
- 3G
- 3 DT Team
- 10 Analysis Engineer

- 3G Optimization Project
- 9 cities
- Hotspot
- Benchmark
- 3G Verification Tests
- 3 DT teams

- 2G Network Swap & Optimization Project
- Greater Baku Area with 500 Swap Sites
- KPI Harmonization and Formula Mapping
- Parameter Mapping (Siemens vs Nokia)
- New Frequency Planning
- Cluster Acceptance based on Pre/Post Targets
- GPRS and EDGE Testing
- Benchmarking Against Competitors
- New Features Trials in Nokia S-13 BSS
- DT and Network KPI Analysis
- Identifying HW, TXN and Core Issues
- Maintaining QOS during Swap

- 2G Network Optimization Project
- All of Albania
- 900 and 1800 network
- Transmission
- Optimization
- Site Surveys
- Benchmarking
- GPRS-EDGE Tests
- Drive Tests & Analysis
- Statistical Analysis

- 2G New Site TI Installation (73 sites)
- 3G Colocated Site TI Installation (24 sites)
- 25 personnel
- 5 Teams
- 8 Vehicles

- Surveillance support in Istanbul 5 personnel
- FLM support 3 personnel
- BTK file preparation
- As Built file preparation
- TSS file preparation
- PHASE 1 3G Installation 98 sites
- PHASE 2 3G Installation 69 sites

Payroll management for the following companies:
- Motorola Turkey : 67 personnel
- NSN Azerbaijan : 2 personnel
- NSN Turkey : 14 personnel
- NSN Uzbekistan : 1 personnel
- Vodafone Turkey : 24 personnel
- ZTE Turkey 8 personnel